(Rpt_325) Changeout Analysis - Detailed

Provides a graphical view of the number of components to be changed in the time period required.

Tips

Date selector defaults to entire plan term, but can be modified to suit user requirements.

Initial parameters

|ControlType|,|IDlist|,|TextList|,|ProjectionTypes|,|LogoLocation|,|UserID|,
|Feature_32|

Report parameters

Default.

System, Strategy Task, Strategy Task Desc, Modifier Code, Occurrence Type, Cost Type, Sub System, Task Type, Component Type, Region, Division, Cost Responsibility, Equipment Location, Part Classification, Part Rating, Primary Part No, Rebuild Location, Review Status, Sales Status

Related Topics Link IconRelated Topics